K Type Worker Camp in Zhuhai: Housing for 1,000 Workers

Worker camp Zhuhai: a new development zone in Zhuhai needed housing for the workers building a nearby commercial center and office buildings. E-TOM Housing supplied a complete project camp made entirely of K Type prefab houses: nine buildings designed for 1,000 people. The main structure was installed in 10 days, and the camp is now about 90% complete.

Project at a glance

LocationNew development zone, Zhuhai, Guangdong, China
PurposeWorker accommodation for the construction of a nearby commercial center and office buildings
Capacity1,000 workers
House typeK Type prefab houses only
Number of buildings9
Dormitory layout20 rooms per building, 8 workers per room
FacilitiesWorker dormitories, kitchen, shower rooms, toilets
Installation time10 days (main structure installation)
StatusAbout 90% complete

What the camp includes

Every building on this site is a K Type house. Together they cover the four things a large workforce needs every day:

  • Worker dormitories for sleeping and rest
  • A kitchen for on-site meals
  • Shower rooms for washing after work
  • Toilets for the whole camp

Each dormitory building has 20 rooms, and each room sleeps 8 workers. Using one house type for all four functions keeps planning simple and installation fast.

What to plan before ordering a worker camp

If you are planning a camp like this one, settle these points first:

  • Headcount: the number of workers on site at peak, not the average.
  • Room layout: how many people share a room, and how rooms are grouped into buildings.
  • Catering: where meals are prepared and where workers eat.
  • Washing and sanitation: enough shower rooms and toilets for the whole camp.
  • Site conditions: delivery access, ground preparation, power and water connections.
  • Schedule: when the first workers move in and when the project ends.

A clear answer to each point makes the layout and the quote much faster to prepare.

Why this project matters for buyers

A camp for 1,000 workers is a different job from a few site offices. Sleeping space, catering, washing and sanitation all have to work together from the first day. If you are planning something similar, the IFC and EBRD publication on workers’ accommodation is a useful planning reference.For a smaller camp, see the workforce camp we supplied in Zhongshan, or browse our other worker accommodation projects. If budget is your first question, our guide to prefab house cost explains what drives the price.

FAQ

Can a K Type camp house 1,000 workers?

Yes. This Zhuhai project was designed for 1,000 workers, using nine K Type buildings for dormitories, a kitchen, shower rooms and toilets.

How long did it take to install the camp?

The main structure of the nine K Type buildings was installed in 10 days. This does not include foundation, utilities or finishing work. Time on other projects depends on the site and the number of buildings.

What does a K Type worker camp include?

This one includes worker dormitories, a kitchen, shower rooms and toilets. The exact mix depends on the number of workers and the site.

Can E-TOM Housing plan a camp for a different number of workers?

Send us your headcount and site plan, and we will propose a layout and quote. Contact us through our contact page.

Selling Various Types of Prefabricated Container Houses

Detachable container house

big wave container house 副本

Shipping Modular Container

expandable house

Expandable Container House

foldable container house

Foldable House

Flat Pack Container House

apple House

Apple Cabin

modular restroom

Mobile Toilet

mobile sentry box

Mobile Guard Booth

creative room

Creative Customized House

garbage room

Mobile Waste Station

This field is required.
This field is required.
Add any additional comments or inquiries.